Seferm.com - Breaking News, Job Search Engine, Sudoku, Astrology
 
DIY Deals
Get Great DIY Deals









Venetian Plaster Step By Step With Firenze Marmorino

 
     

Video Text

Step 1:
Preparing your walls
Your walls need to be at level 4 - 5 and primed with a water based, latex primer

Step 2:
Apply the first coat
The thickest coat of the 3 coat process. Must use Stainless steel trowel only, other wise product can be stained by metal. No straight lines and do not go over the same area too many times.

Step 3:
Apply the second coat
After first coat is fully dry (preferably overnight)apply enough material to completely cover the first coat and leave it smooth and unpolished. If necessary lightly sand high spots and corners with sanding block size 400. Apply thinly and evenly. Do not compress product.

 

Step 4:
Apply the third coat
The third coat is applied after the 2nd coat is fully dry and the high spots and corners have been sanded down. Apply thin coat with a bit of pressure to allow the product to adhere to 2nd coat. cover about 4 - 6 sq feet and go back to burnish. Burnish and check by viewing wall from side for sheen and reflection.

Step 5:
Apply protection soap
After the third coat has been burnished and dried, apply the water based impregnation paste. Apply as much as the product with absorb and make sure to wipe off the excess in order to avoid unfavorable results.This is not a wax.

 
About Seferm | Privacy Policy | Advertise With Us | Contact Us | Online Archive | Seferm Link Directory | Sitemap
Copyright © 2007, Seferm.com Incorporated. All Rights Reserved. Terms of Use | Link Policy